注册 登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

寫意編織

早前忙得透不過氣, 現在閒了又不想編織.那買了的毛線怎樣處理呢????

 
 
 

日志

 
 

引用 【转载】2012年09月27日   

2012-09-28 07:09:22|  分类: 小朋友 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |
本文转载自木棉花《【转载】2012年09月27日》

2012年09月27日 - 紅陽聚寶 - 紅陽聚寶 歡迎來訪

NOTES:
1. Sweater is knit in one piece from the top down. The yoke (top portion of the sweater) is worked in a lacy pattern and the lower portion (body) is worked in k1, p1 ribbing. 2. The first 4 rows are knit back and forth on 2 straight needles (not the dpns) to make a center back neck slit, then the sts are joined and worked in the rnd on dpns.
3. Stitch markers are used to mark increases and to separate reps of the lacy pattern. When working the lacy pattern, count your sts at the end of each row.
4. When yoke is complete, stitches are bound off to create short, cap sleeves.


2012年09月27日 - 紅陽聚寶 - 紅陽聚寶 歡迎來訪

12-18 month 2-3 year chart
Size 12-18 months (2-3 years)

4-5 years chart
Size 4-5 years

key

SWEATER
Yoke
With straight needles, cast on 56 (56, 63) sts.
Follow instructions below for the size you are making.

Size 12-18 months ONLY
Note: Rows 1-4 are worked back and forth in rows.
Row 1 (WS): Purl.
Row 2 (RS, begin lace pattern): *K1, k2tog, yo, k1, yo, ssk, k1; rep from * to end of row.
Row 3: Purl.
Row 4: *K2tog, yo, k3, yo, ssk; rep from * to end of row.
Divide sts onto 4 dpns.
Place marker for beg of rnd and join by knitting the first st on left hand needle with the working yarn from the right hand needle and being careful not to twist sts.
You will now be working in rnds.
Rnd 1 (RS): Knit.
Rnd 2 (Inc Rnd): *M1 (inc made), place marker (pm), k1, k2tog, yo, k1, yo, ssk, k1, k1below (inc made); rep from * to end of rnd - 72 sts at the end of this rnd.
Note: Slip markers on every rnd.
Rnd 3: Knit.
Rnd 4: K to marker, *k2tog, yo, k3, yo, ssk, k to next marker; rep from * around.
Rnd 5: Knit.
Rnd 6: K to marker, *k1, k2tog, yo, k1, yo, ssk, k to next marker; rep from * around.
Rnd 7-9: Rep Rnds 3-5.
Next Rnd (Inc Rnd): *M1, k1, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k1, k1below; rep from * to end of rnd - 104 sts.
Next 7 Rnds: Rep Rnds 3-9.
Next Rnd (Inc Rnd): *K1, M1, k2, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k2, M1, k1; rep from * to end of rnd - 136 sts.
Next 7 Rnds: Rep Rnds 3-9.
Next Rnd (Inc Rnd): *K2, M1, k3, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k3, M1, k2; rep from * to end of rnd - 168 sts.
Next 7 Rnds: Rep Rnds 3-9.
Next Rnd (Inc Rnd): *K3, M1, k4, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k4, M1, k3; rep from * to end of rnd - 200 sts.
Next 3 Rnds: Rep Rnds 3-5.
Remove markers in last rnd.
Now proceed to the instructions in the 'Body' section below to complete the Sweater.
Size 2-3 years ONLY Work all rnds as given for Size 12-18 months, then work the following 2 rnds.
Next Rnd (Inc Rnd): *K4, M1, k5, k2tog, yo, k3, yo, ssk, k5, M1, k4; rep from * to end of rnd - 216 sts.
Next Rnd: Knit.
Now proceed to the instructions in the 'Body' section below to complete the Sweater.

Size 4-5 years ONLY
Row 1 (WS): Purl.
Row 2: *K2, k2tog, yo, k1, yo, ssk, k1; rep from * to end of row.
Row 3: Purl.
Row 4: *K1, k2tog, yo, k3, yo, ssk; rep from * to end of row.
Divide sts onto 4 dpns.
Place marker for beg of rnd.
Join by working the first st on left hand needle with the working yarn from the right hand needle and being careful not to twist sts.
You will now be working in rnds.
Rnd 1 (RS): Knit.
Rnd 2 (Inc Rnd): *K1, M1, place marker (pm), k1, k2tog, yo, k1, yo, ssk, k1, M1; rep from * to end of rnd - 80 sts at the end of this rnd.
Note: Slip markers on every rnd.
Rnd 3: Knit.
Rnd 4: K to marker, *k2tog, yo, k3, yo, ssk, k to next marker; rep from * around.
Rnd 5: Knit.
Rnd 6: K to marker, *k1, k2tog, yo, k1, yo, ssk, k to next marker; rep from * around.
Rnd 7-9: Rep Rnds 3-5.
Next Rnd (Inc Rnd): *K1, M1, k1, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k1, M1; rep from * to end of rnd - 112 sts.
Next 7 Rnds: Rep Rnds 3-9.
Next Rnd (Inc Rnd): *K2, M1, k2, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k2, M1, k1; rep from * to end of rnd - 144 sts.
Next 7 Rnds: Rep Rnds 3-9.
Next Rnd (Inc Rnd): *K3, M1, k3, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k3, M1, k2; rep from * to end of rnd - 176 sts.
Next 7 Rnds: Rep Rnds 3-9.
Next Rnd (Inc Rnd): *K4, M1, k4, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k4, M1, k3; rep from * to end of rnd - 208 sts.
Next 7 Rnds: Rep Rnds 3-9.
Next Rnd (Inc Rnd): *K5, M1, k5, M1, k1, k2tog, yo, k1, yo, ssk, k1, M1, k5, M1, k4; rep from * to end of rnd - 240 sts.
Next Rnd: Knit, removing markers as you come to them.
Now proceed to the instructions in the 'Body' section below to complete the Sweater.

Body
ALL SIZES
Note: In the next rnd, sts are bound-off for cap sleeves.
Dividing Rnd: Pm (to mark new beg of rnd), k25 (27, 30) for first half of Back, bind off 50 (54, 60) for sleeve, k50 (54, 60) for Front, bind off 50 (54, 60) for sleeve, k25 (27, 30) for rem of Back - 100 (108, 120) sts remaining for body at the end of this rnd.
Next Rnd: Working on the 100 (108, 120) Body sts only, *k1, p1; rep from * around.
Rep last rnd until piece measures 5 1/2 (6, 7) in. (14 (15, 18) cm) from Dividing Rnd. Bind off all sts in rib.

FINISHING
Sleeve Edging
Rnd 1: From RS, with dpns, pick up and k50 (54, 60) sts evenly spaced around one sleeve. Place marker for beg of rnd.
Next 4 Rnds: *K1, p1; rep from * around.
Bind off. Rep around second sleeve.

  评论这张
 
阅读(224)| 评论(0)
推荐 转载

历史上的今天

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2017